How long until your first sale in Korea

The calendar for a first sale in Korea is set by what you wait for, not what you do. A stage-by-stage table of working days and waiting days, how to add business days and calendar days together, what decides the document timeline, which stages overlap, and what to change when you are short on time.

How long until your first sale in Korea

The calendar for your first sale in Korea is set by what you wait for, not by what you do. Writing copy and building pages goes faster when you add people. Filing a document and waiting for a reply, or moving goods across a border, does not. So you order the work by longest wait first rather than by importance.

How long does each stage take?

Split every line of the schedule into two columns: days your own people are working, and days you are waiting for a reply after handing something over. The working days below are example figures. The waiting column has no numbers, because it depends on the product and on the office receiving the filing — you fill that column in from the next section.

StageYour working daysWait after handoverUnit the wait is counted in
Deciding how and under whose name you sell3–5 business days——
Checking and filing documents2–4 business daysAs the receiving office statesBusiness days
Opening a place to sell1–2 business daysDiffers by venueBusiness days
Building the Korean-language pages10–15 business days1–2 review roundsBusiness days
Shipping stock and customs clearanceHalf a day to place the orderTransit and clearanceCalendar days
Test orders and first sale2–3 business days——

Two terms, in one line each. Customs clearance — the check that matches your paperwork against the actual goods as they cross the border. A place to sell — wherever the product sits for a buyer to find: a channel shared with many other sellers, or a store you build and run yourself. In this table only the stock line moves on calendar days; every other line is counted in business days.

Why count business days and calendar days separately?

The people who build things and receive filings answer in business days, while goods in transit move on calendar days. Twenty-five business days is five weeks on the calendar. Add the two units together without converting and a plan you thought was one month turns out to be five weeks. Convert every cell to calendar days before you add anything up.

Korea has public holidays beyond the weekend, and during the week of a long traditional holiday offices and logistics warehouses are closed at the same time. How many such days there are, and when they fall, changes from year to year. Before you fix a schedule, open a Korean calendar for that year and count how many closed days fall inside the span you are planning, then add them.

When a lead time comes back written in business days, divide by 5 to get weeks and move the weeks onto the calendar. There is a simpler route as well — when you ask for a quote or a filing receipt, ask for a date rather than a number of days, and the other side does this conversion for you.

What decides how long the documents take?

The dates on the document side are set by the product, not by your company. Two items in the same box can follow different checks depending on which category each one falls into. Ask about the five lines below first, and the empty waiting column in the table above fills itself in.

What sets the durationWhat you are checkingWhere to ask
Product classificationWhich category this item falls intoYour customs agent · the responsible agency's help desk
Whether testing or filing appliesWhether a sample must be submitted and a result returnedThe responsible agency's help desk
Korean labelling dutiesWhat has to appear on the outside, and in which languageThe same help desk
Who sells, on paperHow you place a selling entity inside the countryTax and legal advisers
Requirements per venueThe document list that venue asks forThe onboarding guide of the channel you are joining

All five are answered by asking, and each takes about half a day. When an answer comes back, write down the name of the document it rests on and the date you checked, so you are not hunting for the same paragraph again when you file.

Where does the timeline stretch?

Timelines stretch mostly where work is redone. Four places catch people repeatedly.

First, the selling name is settled late. Nothing on the document side and nothing on the venue side can start until it is clear whose name the goods are sold under. Second, labelling text is confirmed late and the outer packaging has to be made again. A printed box cannot be corrected, and replacing it with an applied label still means the wording goes through a check.

Third, page assets have to be rebuilt for Korean. If the images you use at home have text baked into them, translation alone will not carry them over — someone opens the source file and rebuilds each one. Fourth, every round trip costs an extra day: with a time-zone gap and translation in between, one question and one answer take two days. Ten round trips is two weeks. Batching questions into one message shrinks this column more than anything else on the list.

Which stages can run at the same time?

What you are waiting forWhat to run alongside it
A reply on a filingKorean product copy · working out the price build-up
Test resultsListing the requirements per venue · collecting the documents needed
A reply on opening a venueProducing page assets · drafting shipping and enquiry replies
Transit and clearanceLoading the pages · walking through the test-order flow

Two joints cannot be overlapped. You cannot file before the selling name is settled, and you do not print outer packaging before the labelling text is confirmed. Keep those two in order and everything else can run early. Running the whole list strictly one stage after another adds a month or more to the calendar.

What do you change when you are short on time?

OrderWhat you changeWait it removesWhat it costs instead
1Open one venue instead of severalThe requirements and replies attached to each venueA smaller first sales volume
2Start with a single itemThe documents and labelling attached to each itemA thinner range
3Send the first stock by air, in a small quantityCalendar days in transitHigher freight cost per unit
4Start with a single pageProduction and review roundsRebuilding it later
5Sell through a selling entity already inside the countryThe whole stretch spent setting up an entityTime spent agreeing terms

One line never goes on the cutting list — checking documents and labelling. Skip it and the goods stop at the border, and the time that costs is longer than the time checking would have taken. Use 1 and 2 first, because both are easy to reverse. Number 5 shortens the calendar the most but means rewriting your commercial terms, so look at it last.

What to do today

Pick one product you intend to sell and send an enquiry today to the responsible agency's help desk asking which checks that product is subject to in Korea. Three lines describing what it is made of and how it is used is enough. That single reply sets the longest cell in your calendar, and sending the enquiry takes about an hour.

← Back to list

Keep reading

We start by working out what you actually need.

Get a quote within 24 hours
KakaoTalkSIXONE customer center on KakaoTalk (opens in a new tab)